Thanks for your patience during our recent outage at scalar.usc.edu. While Scalar content is loading normally now, saving is still slow, and Scalar's 'additional metadata' features have been disabled, which may interfere with features like timelines and maps that depend on metadata. This also means that saving a page or media item will remove its additional metadata. If this occurs, you can use the 'All versions' link at the bottom of the page to restore the earlier version. We are continuing to troubleshoot, and will provide further updates as needed. Note that this only affects Scalar projects at scalar.usc.edu, and not those hosted elsewhere.
Lounging in the 60sMain MenuIntroductionHow to use our websiteObjectsMission 66 OverviewRevitalizing the ParksTaliesin Associated ArchitectsBeaver Meadows Visitor CenterConclusion
12017-11-19T14:24:54-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50Accessibility (Context)Joseph Sarr5Tags for all pages in the "mission 66 context" subcategory: "accessibility"plain2017-12-03T17:53:06-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50
12017-11-18T22:45:14-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50Rocky Mountain National Park (Context)Joseph Sarr4Tags for all pages in the "context" subcategory "rocky mountain national park"plain2017-12-03T18:18:25-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50
12017-11-19T13:31:49-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50Mission 66 (Time Period)Joseph Sarr3Tags for all pages in the "time period" subcategory "mission 66"plain2017-11-19T14:17:21-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50
12017-11-19T14:30:00-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50Infrastructural ModificationsJoseph Sarr3Tags for all pages in the "mission 66 context" subcategory "infrastructural modifications"plain2017-12-03T18:13:40-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50
12017-12-03T18:27:00-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50Taliesin (Context)Joseph Sarr1Tags for all pages in the "general context" subcategory "taliesin"plain2017-12-03T18:27:00-08:00Joseph Sarr42c75818df9bcc46392bf104d301a3c7d8892e50
This page references:
12017-11-15T21:17:07-08:00Headquarters Site (Spring 1957)4The Beaver Meadows site before construction in 1957. Tom Casey and others at Taliesin intended to include the pine tree in this photo as a part of their parking lot design. However, in May of 1965 Casey was informed that this would not be possible and the tree would have to be removed. Photo courtesy of ROMO Archives.plain2017-12-03T22:50:05-08:00
12017-11-15T21:50:53-08:00Construction of Beaver Meadows (January 1965)3Crane hoisting pre-cast slabs for the new building, January 1965. Photo courtesy of ROMO Archives.plain2017-12-03T22:48:51-08:00